ANALYSIS OF AVAILABILITY AND WATER NEEDS IN THE FIELD OF KAMOJANG GEOTHERMAL (Case Study: PT Pertamina Geothermal Energy Kamojang) Kanya Swasti Wulandari (12809029) ABSTRACT

As a country located at the confluence of 3 (three) major tectonic plates, making Indonesia has the potential earth heat large as that of 29,000 MW. Geothermal Energy is the green energy and sustainable energy, where the injection of water into the reservoir is an activity that needs to be done (if...

Full description

Saved in:
Bibliographic Details
Main Author: SWASTI WULANDARI (NIM : 12809029); Pembimbing : Dra. Atika Lubis, MS, KANYA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/18781
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:18781
spelling id-itb.:187812017-09-27T11:45:46ZANALYSIS OF AVAILABILITY AND WATER NEEDS IN THE FIELD OF KAMOJANG GEOTHERMAL (Case Study: PT Pertamina Geothermal Energy Kamojang) Kanya Swasti Wulandari (12809029) ABSTRACT SWASTI WULANDARI (NIM : 12809029); Pembimbing : Dra. Atika Lubis, MS, KANYA Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/18781 As a country located at the confluence of 3 (three) major tectonic plates, making Indonesia has the potential earth heat large as that of 29,000 MW. Geothermal Energy is the green energy and sustainable energy, where the injection of water into the reservoir is an activity that needs to be done (if the water balance in a reservoir of water vapor not met), so the availability and water needs in the area of Geothermal Power Plant (PLTP) Kamojang concern especially with the development units of a new power plant. A method of hydrometeorology F. J. Mock used to conduct the analysis and to determine the amount of run off (surface water) in the area of PLTP Kamojang using rainfall data on average monthly. And calculation of Darcy's law is used to determine the potential availability of water. <br /> <br /> <br /> <br /> <br /> <br /> <br /> The results obtained in this research is to know the availability and water needs in the area of PLTP Kamojang (especially in the Sub-DAS Cikaro) had an average of the availability of surface water in the month wet (November - May) as much as 940,21 million liters/ year and the month dry (June - October) as much as 352,05 million liters/ year. And with the Unit V (capacity 30 MW) as a development unit of the new power plants in the area of PLTP Kamojang, it needs water every month will be increased by 0.16 million litres/ month. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description As a country located at the confluence of 3 (three) major tectonic plates, making Indonesia has the potential earth heat large as that of 29,000 MW. Geothermal Energy is the green energy and sustainable energy, where the injection of water into the reservoir is an activity that needs to be done (if the water balance in a reservoir of water vapor not met), so the availability and water needs in the area of Geothermal Power Plant (PLTP) Kamojang concern especially with the development units of a new power plant. A method of hydrometeorology F. J. Mock used to conduct the analysis and to determine the amount of run off (surface water) in the area of PLTP Kamojang using rainfall data on average monthly. And calculation of Darcy's law is used to determine the potential availability of water. <br /> <br /> <br /> <br /> <br /> <br /> <br /> The results obtained in this research is to know the availability and water needs in the area of PLTP Kamojang (especially in the Sub-DAS Cikaro) had an average of the availability of surface water in the month wet (November - May) as much as 940,21 million liters/ year and the month dry (June - October) as much as 352,05 million liters/ year. And with the Unit V (capacity 30 MW) as a development unit of the new power plants in the area of PLTP Kamojang, it needs water every month will be increased by 0.16 million litres/ month.
format Final Project
author SWASTI WULANDARI (NIM : 12809029); Pembimbing : Dra. Atika Lubis, MS, KANYA
spellingShingle SWASTI WULANDARI (NIM : 12809029); Pembimbing : Dra. Atika Lubis, MS, KANYA
ANALYSIS OF AVAILABILITY AND WATER NEEDS IN THE FIELD OF KAMOJANG GEOTHERMAL (Case Study: PT Pertamina Geothermal Energy Kamojang) Kanya Swasti Wulandari (12809029) ABSTRACT
author_facet SWASTI WULANDARI (NIM : 12809029); Pembimbing : Dra. Atika Lubis, MS, KANYA
author_sort SWASTI WULANDARI (NIM : 12809029); Pembimbing : Dra. Atika Lubis, MS, KANYA
title ANALYSIS OF AVAILABILITY AND WATER NEEDS IN THE FIELD OF KAMOJANG GEOTHERMAL (Case Study: PT Pertamina Geothermal Energy Kamojang) Kanya Swasti Wulandari (12809029) ABSTRACT
title_short ANALYSIS OF AVAILABILITY AND WATER NEEDS IN THE FIELD OF KAMOJANG GEOTHERMAL (Case Study: PT Pertamina Geothermal Energy Kamojang) Kanya Swasti Wulandari (12809029) ABSTRACT
title_full ANALYSIS OF AVAILABILITY AND WATER NEEDS IN THE FIELD OF KAMOJANG GEOTHERMAL (Case Study: PT Pertamina Geothermal Energy Kamojang) Kanya Swasti Wulandari (12809029) ABSTRACT
title_fullStr ANALYSIS OF AVAILABILITY AND WATER NEEDS IN THE FIELD OF KAMOJANG GEOTHERMAL (Case Study: PT Pertamina Geothermal Energy Kamojang) Kanya Swasti Wulandari (12809029) ABSTRACT
title_full_unstemmed ANALYSIS OF AVAILABILITY AND WATER NEEDS IN THE FIELD OF KAMOJANG GEOTHERMAL (Case Study: PT Pertamina Geothermal Energy Kamojang) Kanya Swasti Wulandari (12809029) ABSTRACT
title_sort analysis of availability and water needs in the field of kamojang geothermal (case study: pt pertamina geothermal energy kamojang) kanya swasti wulandari (12809029) abstract
url https://digilib.itb.ac.id/gdl/view/18781
_version_ 1821119636196818944