ENERGY OPTIMIZATION MODELING OF GEOTHERMAL POWER PLANT (CASE STUDY : DARAJAT GEOTHERMAL FIELD UNIT III, PT. CHEVRON GEOTHERMAL INDONESIA)

Darajat unit III geothermal power plant is one of the power plant which is developed by PT. Chevron Geothermal Indonesia (CGI). The power plant has capacity 121 MW on load 110%. The greatest utilization power is consumed by <br /> <br /> <br /> hot well pump and cooling tower fan...

全面介紹

Saved in:
書目詳細資料
主要作者: H.M.S. (NIM : 22611008); Pembimbing : Dr. Ir. Prihadi Setyo Darmanto, RIZAL
格式: Theses
語言:Indonesia
在線閱讀:https://digilib.itb.ac.id/gdl/view/20467
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
機構: Institut Teknologi Bandung
語言: Indonesia