ENERGY OPTIMIZATION MODELING OF GEOTHERMAL POWER PLANT (CASE STUDY : DARAJAT GEOTHERMAL FIELD UNIT III, PT. CHEVRON GEOTHERMAL INDONESIA)

Darajat unit III geothermal power plant is one of the power plant which is developed by PT. Chevron Geothermal Indonesia (CGI). The power plant has capacity 121 MW on load 110%. The greatest utilization power is consumed by <br /> <br /> <br /> hot well pump and cooling tower fan...

Full description

Saved in:
Bibliographic Details
Main Author: H.M.S. (NIM : 22611008); Pembimbing : Dr. Ir. Prihadi Setyo Darmanto, RIZAL
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/20467
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items