ENERGY OPTIMIZATION MODELING OF GEOTHERMAL POWER PLANT (CASE STUDY : DARAJAT GEOTHERMAL FIELD UNIT III, PT. CHEVRON GEOTHERMAL INDONESIA)
Darajat unit III geothermal power plant is one of the power plant which is developed by PT. Chevron Geothermal Indonesia (CGI). The power plant has capacity 121 MW on load 110%. The greatest utilization power is consumed by <br /> <br /> <br /> hot well pump and cooling tower fan...
Saved in:
Main Author: | H.M.S. (NIM : 22611008); Pembimbing : Dr. Ir. Prihadi Setyo Darmanto, RIZAL |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/20467 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PREDICTION OF CARBON BEHAVIORS WITH EMPHASIS ON CLEAN DEVELOPMENT MECHANISM (CDM): THE DARAJAT GEOTHERMAL FIELD
by: PERMATASARI (NIM : 22611024), DEWI -
ANALYSIS AND OPTIMATION OF COOLING TOWER GEOTHERMAL POWER PLANT UNIT 4 CASE STUDY PT. PERTAMINA GEOTHERMAL ENERGY KAMOJANG AREA
by: ABIMOTO (NIM : 13107043); Pembimbing Utama : Dr. Ir. Ari Darmawan Pasek, AZFAR -
STUDY ON THE MODIFICATION OF CONDENSER AND COOLING TOWER SYSTEM TO INCREASE TURBINE POWER OF GEOTHERMAL POWER PLANT
by: ASMORO BAHAR (NIM : 131 06 019); Pembimbing : Dr. Ir. Prihadi Setyo Darmanto, AGUNG -
ENERGY AUDIT OF GEOTHERMAL POWER PLANT USING INTERNATIONAL STANDARD
by: BUDI NUGRAHA (NIM : 22610003); Pembimbing : Dr. Ir. Abdurrachim, ADITYA -
Evaluation of LCV Valve Closing Effect on Force Increase of HWP Circulating Water Pump Impeller in Darajat II Geothermal Power Plant
by: KUNCORO HADI (NIM 13103050), NUR