PERFORMANCE ANALYSIS OF UPPER PART TUNNELING CYCLE OF THE XYZ TUNNEL
The XYZ Tunnel Project is a double track railroad tunnel through 473 meters of <br /> <br /> hills with the inlet side at KM 359 + 155 and the outlet side at KM 359 + 628. <br /> <br /> Tunneling using New Austrian Tunneling Method (NATM) is focused to complete <br /> &...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/25488 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |