PERFORMANCE ANALYSIS OF UPPER PART TUNNELING CYCLE OF THE XYZ TUNNEL

The XYZ Tunnel Project is a double track railroad tunnel through 473 meters of <br /> <br /> hills with the inlet side at KM 359 + 155 and the outlet side at KM 359 + 628. <br /> <br /> Tunneling using New Austrian Tunneling Method (NATM) is focused to complete <br /> &...

Full description

Saved in:
Bibliographic Details
Main Author: INDRA SUBROTO (NIM : 12114006), ANDHIKA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/25488
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items