STABILITY ANALYSIS OF THE NANJUNG T2 DIVERSION TUNNEL BASED ON THE RESULT OF CONVERGENT MEASUREMENTS
The Nanjung Diversion Tunnel is a twin tunnel that is used to drain the water of the Citarum River in Curug Jompong, Kecamatan Margaasih, Kabupaten Bandung. At the time of excavation there will be a voltage redistribution until a new equilibrium condition is reached. In the process of achieving this...
Saved in:
Main Author: | Nabila Rusfa, Sindi |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/40290 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ANALYSIS OF THE STABILITY OF THE T1 SECTION OF THE OUTLET WATER TUNNEL BASED ON CONVERGENT MEASUREMENTS OF THE NANJUNG WATER TUNNEL
by: Llang Mayo, Keithcar -
ANALYSIS OF ASPECTS THAT COULD AFFECT THE AMOUNT OF CONVERGENCE AND TUNNEL STABILITY IN TUNNEL OF WATER NANJUNG
by: Rizky Fauzan, Dennas -
STABILITY ANALYSIS OF TWIN TUNNELS THAT ARE DUG UP TOGETHER USING CONVERGENT MONITORING IN NANJUNG
by: Udy Hartadi, M. -
BLASTING EFFECT ANALYSIS ON THE NANJUNG TUNNEL STABILITY
by: Jasipto, Alio -
RELIABILITY ANALYSIS OF NANJUNG TUNNEL
by: Fajar Somahartadi, Tiko