EVALUATING QUICK WIN PROJECTS AT PT PELNI (PERSERO) BY USING D.I.C.E. FRAMEWORK

PT Pelayaran Nasional Indonesia (Persero) is one of the national shipping companies engaged in the field of sea transportation services. The transformation program in the company since 2015 has not had a significant impact on commercial income. The cargo business, which is expected to reach a loa...

Full description

Saved in:
Bibliographic Details
Main Author: Reviyanti, Yuanita
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/45721
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:45721
spelling id-itb.:457212020-01-20T15:43:33ZEVALUATING QUICK WIN PROJECTS AT PT PELNI (PERSERO) BY USING D.I.C.E. FRAMEWORK Reviyanti, Yuanita Manajemen umum Indonesia Theses DICE framework, proyek, quick win, transformasi INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/45721 PT Pelayaran Nasional Indonesia (Persero) is one of the national shipping companies engaged in the field of sea transportation services. The transformation program in the company since 2015 has not had a significant impact on commercial income. The cargo business, which is expected to reach a load factor of 90% in 2019, will only reach 40% in 2018. The quick win project in 2017 which is expected to provide a rapid change is thought to be one of the causes of a less successful transformation program. Therefore, researchers used the D.I.C.E framework to evaluate 17 quick win projects. The research uses quantitative methods by distributing questionnaires to 107 project leaders and project members, research is also carried out with qualitative methods through interviews with 17 project leaders who are included in the category of Win-Zone and Woe-Zon. Based on mapping the DICE score, a positive correlation is found between the successful project and the DICE score. Four projects are included in the win-zone successful category, two projects are included in the win-zone mediocore, and two projects are included in the usuccessful win-zone. In the worryzone, there are two projects that are included in the worry-zone with success status, three projects with less successful status, and two projects with no success status. While the projects included in the Woe-zone are two projects. Element E (effort) is the element with the highest score as a factor that hinders the success of the project, while Element I (integrity of performance) is an element that plays a role in the success of the project text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Reviyanti, Yuanita
EVALUATING QUICK WIN PROJECTS AT PT PELNI (PERSERO) BY USING D.I.C.E. FRAMEWORK
description PT Pelayaran Nasional Indonesia (Persero) is one of the national shipping companies engaged in the field of sea transportation services. The transformation program in the company since 2015 has not had a significant impact on commercial income. The cargo business, which is expected to reach a load factor of 90% in 2019, will only reach 40% in 2018. The quick win project in 2017 which is expected to provide a rapid change is thought to be one of the causes of a less successful transformation program. Therefore, researchers used the D.I.C.E framework to evaluate 17 quick win projects. The research uses quantitative methods by distributing questionnaires to 107 project leaders and project members, research is also carried out with qualitative methods through interviews with 17 project leaders who are included in the category of Win-Zone and Woe-Zon. Based on mapping the DICE score, a positive correlation is found between the successful project and the DICE score. Four projects are included in the win-zone successful category, two projects are included in the win-zone mediocore, and two projects are included in the usuccessful win-zone. In the worryzone, there are two projects that are included in the worry-zone with success status, three projects with less successful status, and two projects with no success status. While the projects included in the Woe-zone are two projects. Element E (effort) is the element with the highest score as a factor that hinders the success of the project, while Element I (integrity of performance) is an element that plays a role in the success of the project
format Theses
author Reviyanti, Yuanita
author_facet Reviyanti, Yuanita
author_sort Reviyanti, Yuanita
title EVALUATING QUICK WIN PROJECTS AT PT PELNI (PERSERO) BY USING D.I.C.E. FRAMEWORK
title_short EVALUATING QUICK WIN PROJECTS AT PT PELNI (PERSERO) BY USING D.I.C.E. FRAMEWORK
title_full EVALUATING QUICK WIN PROJECTS AT PT PELNI (PERSERO) BY USING D.I.C.E. FRAMEWORK
title_fullStr EVALUATING QUICK WIN PROJECTS AT PT PELNI (PERSERO) BY USING D.I.C.E. FRAMEWORK
title_full_unstemmed EVALUATING QUICK WIN PROJECTS AT PT PELNI (PERSERO) BY USING D.I.C.E. FRAMEWORK
title_sort evaluating quick win projects at pt pelni (persero) by using d.i.c.e. framework
url https://digilib.itb.ac.id/gdl/view/45721
_version_ 1821999439436316672