EVALUATING ALTERNATIVES ON LOSS PRODUCTION OPPORTUNITY DUE TO SURFACE FACILITY CONSTRAINT: CASE STUDY OF ANOA & PESUT GATHERING STATION IN PT RCI
As one of the largest oil and gas contractors in Indonesia, PT RCI has managed and optimized the exploration and exploitation in Romeo block for more than 90 years, including from Pesut field and its surrounding satellite fields. As the field & facility ages, increasing fluid production and...
Saved in:
Main Author: | Alfian Rahmanto, Bayu |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/51894 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
EVALUATION OF ALTERNATIVE SOLUTIONS TO RECOVER DEFERRED OIL PRODUCTION DUE TO FACILITY CONSTRAINT: CASE STUDY OF BRAVO GATHERING STATION, PT. CPI
by: Fadli, Ade -
OPTIMIZING MAINTENANCE CYCLE TIME TO IMPROVE SYSTEM AVAILABILITY AND REDUCE LOSS PRODUCTION OPPORTUNITY IN WATER INJECTION PUMP BENAR GATHERING STATION
by: Mahendra, Doni -
DECISION ANALYSIS OF ABANDONMENT AND SITE RETIREMENT FOR SAND PLANT FACILITIES GATHERING STATION PT PERTAMINA HULU ROKAN
by: Rekso Tinamtu, Ali -
DECISION MAKING TO IMPROVE RELIABILITY WATER INJECTION PUMP AT PH GATHERING STATION PT. ABC
by: Eko Prasetyo, M. -
PROBLEM SOLVING AND ALTERNATIVE SELECTION IN THE MITIGATION OF HIGH H2S CONCENTRATIONS AT BEKASAP GATHERING STATION BY USING DECISION ANALYSIS
by: Arif Hidayat, Eko