PROPOSED MATERIAL REQUIREMENTS PLANNING TO PREVENT PRODUCTION SCHEDULE TARDINESS AT PT. XYZ
PT. XYZ is a private based company which operates in research and development area for military defence in Indonesia. Not only researching and developing their products, PT. XYZ also manufactures their products too. For the time being, PT. XYZ in manufacturing the products have a problem, the pro...
Saved in:
Main Author: | Nusantara, Aria |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/52064 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PROPOSED PRODUCT REQUIREMENTS TO INCREASE ADOPTION RATE OF PT XYZ CAMPAIGN MANAGEMENT SYSTEM
by: Puterisantoso, Fiemaelia -
PROPOSED THE NEW MARKETING STRATEGY FOR PT XYZ INTO GLOBAL MARKET (CASE STUDY âFâ LUBRICANT PRODUCTS OF PT XYZ IN THAILAND)
by: Insani Fadilla, Lavie -
PROPOSED PROJECT MANAGEMENT SYSTEM FOR PT XYZ
by: Satiamulyana, Ardi -
PROPOSED BUSINESS GROWTH MANAGEMENT STRATEGY FOR PT XYZ
by: Adiwisastra Rosidi, Rifqi -
BUILDING CHURN PREVENTION STRATEGY WITH CUSTOMER SUCCESS APPROACH FOR PT.XYZ
by: Arfidh, Muhammad