PROPOSING NEW PROCESS DESIGN TO IMPROVE EFFICIENCY OF ENGINE ASSEMBLY PRODUCTION SYSTEM
PT. XYZ is one of the largest automotive manufacturing company in Indonesia, which currently has a total production capacity of 200,000 units / year to produce superior products in all market segments of four-wheeled vehicles (cars), such as LCGC, LMPV, MPV, City Car, and SUVs. In responding to th...
Saved in:
Main Author: | Maulid Adityo, Majdi |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/53107 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PROPOSED STRATEGY TO CREATE NEW PRODUCTS EFFICIENTLY FOR PT ZERO ANDALAN ABADI
by: Retdiwalgi, Ryan -
PROPOSED NEW PRODUCT DEVELOPMENT OF ASSET MANAGEMENT SYSTEM FOR HEALTHCARE FACILITIES USING DESIGN THINKING AND LEAN STARTUP
by: Astiri, Selina -
PROPOSED MULTI-MANNED ASSEMBLY LINE BALANCING AS PRODUCTION SYSTEM IN AIRCRAFT INDUSTRY (CASE STUDY: PT. DIRGANTARA INDONESIA)
by: Zakka Wali, Nazzala -
PROPOSED SOLUTIONS FOR IMPROVING QUEUE MANAGEMENT EFFICIENCY AT BEBEKE OM ARIS
by: Elvira Ananda, Chintya -
PROPOSED IMPROVEMENTS OF SEMINAR BAG PRODUCTION SYSTEM TO MINIMIZE DELAYS IN PRODUCT DELIVERY (CASE STUDY IN CV. ABC)
by: Fauzia, Salma