EXERGY ANALYSIS AND IMPROVEMENT IDEA OF GEOTHERMAL POWER PLANT SALAK UNIT 1, 2, 3.
Saved in:
Main Author: | Noviyanto |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/59745 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Exergy-loss analysis of a typical geothermal power plant system in the Philippines
by: Cabigon, Noel Papas
Published: (1995) -
Analysis of Ejector Performance Towards The Increasing of Non Condensable Gas Percentage Unit 1 and 2 Gunung Salak Geothermal Power Plant
by: HASAN, MUHAMMAD -
THERMODYNAMICS STUDIES OF THIRD UNIT TURBINẺ̉S ELECTRIC POWER DISTRIBUTION AT GUNUNG SALAK GEOTHERMAL POWER PLANT
by: (NIM : 13104119); Dosen Pembimbing, : Ir. Pawito Merto Sontowiro,MSc, MAHENDRATA -
Exergy analysis of the revolving vane compressor unit
by: Na, Yong Tat
Published: (2022) -
UNIT 2 KAMOJANG GEOTHERMAL POWER PLANT UP-RATED
by: Ambarita, Ervant