ANALISIS DAN OPTIMASI MENARA PENDINGIN PLTP UNIT 4 STUDI KASUS PT. PERTAMINA GEOTHERMAL ENERGY AREA KAMOJANG
Saved in:
Main Author: | Abimoto, Azfar |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/60587 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ANALYSIS AND OPTIMATION OF COOLING TOWER GEOTHERMAL POWER PLANT UNIT 4 CASE STUDY PT. PERTAMINA GEOTHERMAL ENERGY KAMOJANG AREA
by: ABIMOTO (NIM : 13107043); Pembimbing Utama : Dr. Ir. Ari Darmawan Pasek, AZFAR -
KAJI TERMODINAMIKA KONDENSOR TIPE KONTAK LANGSUNG PLTP UNIT4 KAMOJANG . STUDI KASUS: PT. PERTAMINA GEOTHERMAL ENERGY
by: Fardias Mu'min, Gea -
OPTIMASI SISTEM EKSTRASI GAS PLTP KAMOJANG UNIT 2
by: Krisna Dana Putra, Arief -
SIMULATION OF H2S DISPERSION USING COMPUTATIONAL FLUID DYNAMICS (Case Study at PLTP IV Pertamina Geothermal Energy Kamojang Area)
by: AKBARI DANASLA (NIM : 12811020), M. -
ANALYSIS OF AVAILABILITY AND WATER NEEDS IN THE FIELD OF KAMOJANG GEOTHERMAL (Case Study: PT Pertamina Geothermal Energy Kamojang)
by: SWASTI WULANDARI (NIM : 12809029), KANYA