IMPROVED GEOTHERMAL POWER GENERATION PERFORMANCE BY INCREASING CONDENSER HEAT TRANSFER AREA
Currently, almost all geothermal power plants in Indonesia use conventional direct contact condensers. Meanwhile, there is an advanced direct contact condenser, which is a conventional condenser with an additional heat transfer area known as structured packing or packing media. One of the geother...
Saved in:
Main Author: | Abdul Rohman, Arif |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/61851 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
STUDY ON THE MODIFICATION OF CONDENSER AND COOLING TOWER SYSTEM TO INCREASE TURBINE POWER OF GEOTHERMAL POWER PLANT
by: ASMORO BAHAR (NIM : 131 06 019); Pembimbing : Dr. Ir. Prihadi Setyo Darmanto, AGUNG -
Analysis of Ejector Performance Towards The Increasing of Non Condensable Gas Percentage Unit 1 and 2 Gunung Salak Geothermal Power Plant
by: HASAN, MUHAMMAD -
Enhancement of air-side heat transfer performance of additively manufactured condensers
by: Pang, Kang Kwan
Published: (2022) -
Enhancement of air-side heat transfer performance of additively manufactured condensers
by: Chan, Yi Qing
Published: (2024) -
SIMULATION MODELING OF GEOTHERMAL POWER PLANT CONDENSING TURBINE TYPE CASE STUDY: WAYANG WINDU GEOTHERMAL POWER PLANT
by: AHMAD (22616002), FAISAL