SELECTION OF THE OPTIMUM STAGED EXCAVATION METHOD FOR THE YOGYAKARTA-BAWEN TWIN TOLL ROAD TUNNELS

The Yogyakarta-Bawen Twin Toll Road Tunnels will be constructed in Kragan, Losari village, Magelang, Central Java with 490-510 meters in length. The twin tunnels will have large dimensions (20.18 m x 13.7 m and 490-510 meters in length) and be excavated through soft-moderate soil materials. In th...

Full description

Saved in:
Bibliographic Details
Main Author: Timothy Motoh, Rexy
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/69407
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:69407
spelling id-itb.:694072022-09-22T10:07:30ZSELECTION OF THE OPTIMUM STAGED EXCAVATION METHOD FOR THE YOGYAKARTA-BAWEN TWIN TOLL ROAD TUNNELS Timothy Motoh, Rexy Indonesia Final Project Yogyakarta-Bawen Tunnel, top heading and bench, three-bench sevenstep, side drift, vertical displacement, strength factor INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/69407 The Yogyakarta-Bawen Twin Toll Road Tunnels will be constructed in Kragan, Losari village, Magelang, Central Java with 490-510 meters in length. The twin tunnels will have large dimensions (20.18 m x 13.7 m and 490-510 meters in length) and be excavated through soft-moderate soil materials. In this study, 3 staged excavation methods are analyzed to obtain the optimum excavation method. The 3 excavation methods are a combination of the top heading and bench method and the side drift method (Method 1), the three-bench seven-step excavation method (Method 2), and the side drift method (Method 3). 2D numerical modeling was carried out on the three methods using a cross-section at STA 20+435 which is the location with the greatest thickness of overburden. The results show that Method 3 has the smallest vertical displacement (3 cm), compared to the others (5 cm). Each method has a minimum plastic zone and an arch effect is formed close to the excavation boundary. In addition, the three excavation methods have a strength factor above 1.5, so they meet the minimum safety factor for tunnel excavation based on KEPMEN ESDM 1827K/MEM/2018. These results show that three excavation methods can be used to excavate Yogyakarta-Bawen Tunnel, but the optimum method is Method 3, which is the side drift method. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The Yogyakarta-Bawen Twin Toll Road Tunnels will be constructed in Kragan, Losari village, Magelang, Central Java with 490-510 meters in length. The twin tunnels will have large dimensions (20.18 m x 13.7 m and 490-510 meters in length) and be excavated through soft-moderate soil materials. In this study, 3 staged excavation methods are analyzed to obtain the optimum excavation method. The 3 excavation methods are a combination of the top heading and bench method and the side drift method (Method 1), the three-bench seven-step excavation method (Method 2), and the side drift method (Method 3). 2D numerical modeling was carried out on the three methods using a cross-section at STA 20+435 which is the location with the greatest thickness of overburden. The results show that Method 3 has the smallest vertical displacement (3 cm), compared to the others (5 cm). Each method has a minimum plastic zone and an arch effect is formed close to the excavation boundary. In addition, the three excavation methods have a strength factor above 1.5, so they meet the minimum safety factor for tunnel excavation based on KEPMEN ESDM 1827K/MEM/2018. These results show that three excavation methods can be used to excavate Yogyakarta-Bawen Tunnel, but the optimum method is Method 3, which is the side drift method.
format Final Project
author Timothy Motoh, Rexy
spellingShingle Timothy Motoh, Rexy
SELECTION OF THE OPTIMUM STAGED EXCAVATION METHOD FOR THE YOGYAKARTA-BAWEN TWIN TOLL ROAD TUNNELS
author_facet Timothy Motoh, Rexy
author_sort Timothy Motoh, Rexy
title SELECTION OF THE OPTIMUM STAGED EXCAVATION METHOD FOR THE YOGYAKARTA-BAWEN TWIN TOLL ROAD TUNNELS
title_short SELECTION OF THE OPTIMUM STAGED EXCAVATION METHOD FOR THE YOGYAKARTA-BAWEN TWIN TOLL ROAD TUNNELS
title_full SELECTION OF THE OPTIMUM STAGED EXCAVATION METHOD FOR THE YOGYAKARTA-BAWEN TWIN TOLL ROAD TUNNELS
title_fullStr SELECTION OF THE OPTIMUM STAGED EXCAVATION METHOD FOR THE YOGYAKARTA-BAWEN TWIN TOLL ROAD TUNNELS
title_full_unstemmed SELECTION OF THE OPTIMUM STAGED EXCAVATION METHOD FOR THE YOGYAKARTA-BAWEN TWIN TOLL ROAD TUNNELS
title_sort selection of the optimum staged excavation method for the yogyakarta-bawen twin toll road tunnels
url https://digilib.itb.ac.id/gdl/view/69407
_version_ 1822991033490735104