SELECTION OF THE OPTIMUM STAGED EXCAVATION METHOD FOR THE YOGYAKARTA-BAWEN TWIN TOLL ROAD TUNNELS
The Yogyakarta-Bawen Twin Toll Road Tunnels will be constructed in Kragan, Losari village, Magelang, Central Java with 490-510 meters in length. The twin tunnels will have large dimensions (20.18 m x 13.7 m and 490-510 meters in length) and be excavated through soft-moderate soil materials. In th...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/69407 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!