SELECTION OF THE OPTIMUM STAGED EXCAVATION METHOD FOR THE YOGYAKARTA-BAWEN TWIN TOLL ROAD TUNNELS

The Yogyakarta-Bawen Twin Toll Road Tunnels will be constructed in Kragan, Losari village, Magelang, Central Java with 490-510 meters in length. The twin tunnels will have large dimensions (20.18 m x 13.7 m and 490-510 meters in length) and be excavated through soft-moderate soil materials. In th...

Full description

Saved in:
Bibliographic Details
Main Author: Timothy Motoh, Rexy
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/69407
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items