ALTERNATIVE DESIGN FOR GLADAK MAINROAD BRIDGE (STA 11+395) YOGYAKARTA-BAWEN TOLL ROAD SECTION 5 USING BALANCED CANTILEVER METHOD
In order to improve the economy in the Yogyakarta to Bawen area, easy mobility access is needed because of the condition of the contours and the ravines that exist in the access between the two areas. The condition of the different contours is a challenge in making connecting roads, especially in ar...
Saved in:
Main Author: | Revansyah Musa Marbun, Aditya |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/77169 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DESIGN OF BORED PILE FOUNDATION AND SLOPE STABILITY OF BALANCED CANTILEVER BRIDGE STUDY CASE: DESIGN ALTERNATIVE FOR MAINROAD GLADAK BRIDGE
by: Zhafran Puturahmadika, Mahdy -
Design Review of Semarang-Bawen Toll Road
by: ADIB ASH SHIDDIQI (NIM 15004144), ALFA -
STABILITY ANALYSIS OF TUNNEL B ON THE YOGYAKARTA-BAWEN TOLL ROAD SECTION AT STA 20+435 UTILIZING THE CENTRAL DIAPHRAGM METHOD USING 3D NUMERICAL MODELING.
by: Maulana Rifqi, Muhammad -
ANALYSIS OF THE EXCAVATION AND STABILITY METHOD AT THE JOGJA-BAWEN TWIN TOLL ROAD TUNNELS
by: Adhitya Y.L.A., Boyke -
SELECTION OF THE OPTIMUM STAGED EXCAVATION METHOD FOR THE YOGYAKARTA-BAWEN TWIN TOLL ROAD TUNNELS
by: Timothy Motoh, Rexy