MULTI-ITEM BATCH SCHEDULING MODEL ON A BATCH PROCESSOR TO MINIMIZE TOTAL ACTUAL FLOW TIME OF PARTS
This research concerns with batch scheduling problem of multi-item processed on a batch processor where processing time of batch depends on total processing time of items in the batch. In this research, one batch may consist of more than one item and the processing time of an item is different fr...
Saved in:
Main Author: | Oktaviana Trisna Devi, Anita |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/79647 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
BATCH SCHEDULING MODEL ON A THREE-STAGE FLOWSHOP WITH THE SEQUENCE OF JOB PROCESSOR BATCH PROCESSOR JOB PROCESSOR TO MINIMIZE TOTAL ACTUAL FLOW TIME
by: Az Zahro, Shafira -
BATCH SCHEDULING MODEL ON THREE-STAGE FLOWSHOP WITH TWO-STAGE JOB PROCESSOR AND ONE STAGE BATCH PROCESSOR TO MINIMIZE TOTAL ACTUAL FLOWTIME
by: Poeri Suryadhini, Pratya -
BATCH SCHEDULING FOR A SINGLE ITEM FLOW SHOP WHICH CONSIDERS MACHINE DETERIORATION TO MINIMIZE TOTAL ACTUAL FLOW TIME
by: NORIZKI( NIM : 23411029 ); Pemimbing : Prof. Dr. Ir. Abdul Hakim Halim, JULFIKAR -
BATCH SCHEDULING FOR A THREE-STAGE HYBRID FLOW SHOP TO MINIMIZE TOTAL ACTUAL FLOW TIME
by: Maulidya, Rahmi -
BATCH SCHEDULING MODEL ON FLEXIBLE FLOW LINE WITH MISSING OPERATIONS TO MINIMIZE TOTAL ACTUAL FLOW TIME
by: RAHMAWATI, SINTA