STUDY OF PRODUCTION PLANNING IN LAST PLANNER SYSTEM (LPS) IMPLEMENTATION :CASE STUDY OF PROJECT X
The implementation of the Last Planner System (LPS), specifically in production planning, has not been done optimally by several countries, including Indonesia. It is indicated by some previous studies that states the implementation of Lookahead Planning (LAP), Weekly Work Planning (WWP), and Lea...
Saved in:
Main Author: | Nadya Pramesti Dwi Putranti, Rr |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/80754 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
LAST PLANNER SYSTEM IMPLEMENTATION IN INDONESIA (CASE STUDY: 2 BUMN CONSTRUCTION COMPANIES)
by: Luh Ayu Indrayani, Ni -
IDENTIFICATION AND STUDY OF CRITICAL RISKS ON CONSTRUCTION PHASE OF UNDERGROUND RAIL INFRASTRUCTURE DEVELOPMENT PROJECT IN INDONESIA (CASE STUDY: PT. X RAIL PROJECT).
by: Rahayu Purwanti, Dwi -
STUDY THE IMPLEMENTATION OF SUSTAINABLE CONSTRUCTION IN BUILDING PROJECT
by: AULIA MUTIANISA, MIFNA -
RELATIONSHIP BETWEEN IMPLEMENTATION VERSUS BARRRIER OF ISO 14001 ON CONSTRUCTION FIRMS CASE STUDY FOR FACTORY, BUILDING & INFRASTRUCTURE PROJECT
by: Dwi Nugroho, Agung -
DEVELOPMENT OF CONTRACTORâS VALUE ENGINEERING IMPLEMENTATION MEASUREMENT MODEL (APPLICATION OF THE MODEL IN THE EPCC PROJECT OF CONTRACTOR PT.X)
by: Ng, Andrew