IDENTIFICATION OF FACTORS CAUSING COST OVERRUN IN INFRASTRUCTURE PROJECTS (CASE STUDY: DIVISI SIPIL UMUM, PT. HUTAMA KARYA (PERSERO))
Saved in:
Main Author: | Aditya Putra, Harind |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/84775 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ANALYSIS OF FACTORS CAUSING DELAYS IN IMPLEMENTATION OF THE HIGH RISE BUILDING CONSTRUCTION PROJECT AT PT. HUTAMA KARYA (PERSERO)
by: Bogo Yustanto, Kurniawan -
THE IMPACT OF COMPENSATION AND JOB SATISFACTION ON EMPLOYEE ENGAGEMENT AT PT HUTAMA KARYA (PERSERO)
by: Sarwana -
COMPETENCY MODELLING ON MARKETING DEPARTMENT IN GENERAL CIVIL DIVISION PT HUTAMA KARYA (PERSERO)
by: Achmadi, Mali -
THE CHALLENGE OF IMPLEMENTATION INDONESIA INDUSTRY 4.0 READINESS INDEX (INDI 4.0) IN INFRASTRUCTURE COMPANY CASE STUDY: AT PT. HUTAMA KARYA (PERSERO)
by: Hutagalung, Martin -
THE CORRELATION OF RISK MANAGEMENT AND INTERNAL CONTROL IN BUDGET RKAP 2020 PT HUTAMA KARYA (PERSERO)
by: Joko Sutarto, Bambang