RISK MANAGEMENT OF CONSTRUCTION SAFETY WORKS ABOVE ACTIVE RAILWAY TRACKS (CASE STUDY: JAKARTA-BANDUNG HIGH-SPEED RAILWAY PROJECT, DK113)
The construction of the Jakarta-Bandung high-speed railway project, a National Strategic Project (PSN) connecting the capital of Jakarta to the capital of West Java, Bandung, is initiated as a form of government responsibility for the needs of passenger transportation, especially rail transportat...
Saved in:
Main Author: | Hartomo, Rezki |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/85418 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
TECHNOLOGY LANDSCAPE OF RAILWAY CONSTRUCTION EQUIPMENT ON INDONESIAN RAILWAY CONTRACTORS
by: Adryan Arif Farrosi, Muhamad -
RELIABILITY OF BEARING CAPACITY OF DRILLED SHAFTS FOUNDATION CASE STUDY OF JAKARTA-BANDUNG HIGH SPEED RAILWAY
by: RIANI, HELZA -
COST AND SCHEDULE RISK ANALYSIS FOR THE JAKARTA-BANDUNG HIGH SPEED RAILWAY SUBSECTION 3D PROJECT FROM THE PERSPECTIVE OF AN INDONESIAN CONTRACTOR
by: Raishania Amarin Gata, Tasya -
DEVELOPMENT OF A TRACK SAFETY PERFORMANCE MODEL FOR TRACK SAFETY PERFORMANCE ASSESSMENT IN INDONESIAN RAILWAY CASES (A CASE STUDY IN OPERATIONAL AREAS 1 JAKARTA, 2 BANDUNG, AND 3 CIREBON OF PT KERETA API INDONESIA (PERSERO))
by: Arisikam, Dicky -
DESIGN OF THE RAILWAY BRIDGE KAYU TANAM - PADANG PANJANG - BATU TABA
by: KURNIAWAN (NIM : 15013152), DENNY