Scheduling dual-arm cluster tools with multiple wafer types and residency time constraints

Accompanying the unceasing progress of integrated circuit manufacturing technology, the mainstream production mode of current semiconductor wafer fabrication is featured with multi-variety, small batch, and individual customization, which poses a huge challenge to the scheduling of cluster tools wit...

Full description

Saved in:
Bibliographic Details
Main Authors: Wang, Jipeng, Hu, Hesuan, Pan, Chunrong, Zhou, Yuan, Li, Liang
Other Authors: School of Computer Science and Engineering
Format: Article
Language:English
Published: 2020
Subjects:
Online Access:https://hdl.handle.net/10356/145527
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-145527
record_format dspace
spelling sg-ntu-dr.10356-1455272020-12-28T01:17:00Z Scheduling dual-arm cluster tools with multiple wafer types and residency time constraints Wang, Jipeng Hu, Hesuan Pan, Chunrong Zhou, Yuan Li, Liang School of Computer Science and Engineering Engineering::Electrical and electronic engineering Cluster Tools Multiple Wafer Types Accompanying the unceasing progress of integrated circuit manufacturing technology, the mainstream production mode of current semiconductor wafer fabrication is featured with multi-variety, small batch, and individual customization, which poses a huge challenge to the scheduling of cluster tools with single-wafer-type fabrication. Concurrent processing multiple wafer types in cluster tools, as a novel production pattern, has drawn increasing attention from industry to academia, whereas the corresponding research remains insufficient. This paper investigates the scheduling problems of dual-arm cluster tools with multiple wafer types and residency time constraints. To pursue an easy-to-implement cyclic operation under diverse flow patterns, we develop a novel robot activity strategy called multiplex swap sequence. In the light of the virtual module technology, the workloads that stem from bottleneck process steps and asymmetrical process configuration are balanced satisfactorily. Moreover, several sufficient and necessary conditions with closed-form expressions are obtained for checking the system's schedulability. Finally, efficient algorithms with polynomial complexity are developed to find the periodic scheduling, and its practicability and availability are demonstrated by the offered illustrative examples. Published version 2020-12-28T01:17:00Z 2020-12-28T01:17:00Z 2020 Journal Article Wang, J., Hu, H., Pan, C., Zhou, Y., & Li, L. (2020). Scheduling dual-arm cluster tools with multiple wafer types and residency time constraints. IEEE/CAA Journal of Automatica Sinica, 7(3), 776-789. doi:10.1109/JAS.2020.1003150 2329-9266 https://hdl.handle.net/10356/145527 10.1109/JAS.2020.1003150 3 7 776 789 en IEEE/CAA Journal of Automatica Sinica © 2020 the Chinese Association of Automation. All rights reserved. This paper was published in IEEE/CAA Journal of Automatica Sinica and is made available with permission of the Chinese Association of Automation. application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic Engineering::Electrical and electronic engineering
Cluster Tools
Multiple Wafer Types
spellingShingle Engineering::Electrical and electronic engineering
Cluster Tools
Multiple Wafer Types
Wang, Jipeng
Hu, Hesuan
Pan, Chunrong
Zhou, Yuan
Li, Liang
Scheduling dual-arm cluster tools with multiple wafer types and residency time constraints
description Accompanying the unceasing progress of integrated circuit manufacturing technology, the mainstream production mode of current semiconductor wafer fabrication is featured with multi-variety, small batch, and individual customization, which poses a huge challenge to the scheduling of cluster tools with single-wafer-type fabrication. Concurrent processing multiple wafer types in cluster tools, as a novel production pattern, has drawn increasing attention from industry to academia, whereas the corresponding research remains insufficient. This paper investigates the scheduling problems of dual-arm cluster tools with multiple wafer types and residency time constraints. To pursue an easy-to-implement cyclic operation under diverse flow patterns, we develop a novel robot activity strategy called multiplex swap sequence. In the light of the virtual module technology, the workloads that stem from bottleneck process steps and asymmetrical process configuration are balanced satisfactorily. Moreover, several sufficient and necessary conditions with closed-form expressions are obtained for checking the system's schedulability. Finally, efficient algorithms with polynomial complexity are developed to find the periodic scheduling, and its practicability and availability are demonstrated by the offered illustrative examples.
author2 School of Computer Science and Engineering
author_facet School of Computer Science and Engineering
Wang, Jipeng
Hu, Hesuan
Pan, Chunrong
Zhou, Yuan
Li, Liang
format Article
author Wang, Jipeng
Hu, Hesuan
Pan, Chunrong
Zhou, Yuan
Li, Liang
author_sort Wang, Jipeng
title Scheduling dual-arm cluster tools with multiple wafer types and residency time constraints
title_short Scheduling dual-arm cluster tools with multiple wafer types and residency time constraints
title_full Scheduling dual-arm cluster tools with multiple wafer types and residency time constraints
title_fullStr Scheduling dual-arm cluster tools with multiple wafer types and residency time constraints
title_full_unstemmed Scheduling dual-arm cluster tools with multiple wafer types and residency time constraints
title_sort scheduling dual-arm cluster tools with multiple wafer types and residency time constraints
publishDate 2020
url https://hdl.handle.net/10356/145527
_version_ 1688665308372402176