Investigation of oil rig building engineering and construction sequence improvement using design structure matrix analysis
The construction of an Oilrig involves various highly complex concurrent activities and it takes about twenty-two months to completely build a reliable offshore structure for oil drilling use. This dissertation presents an investigation of oilrig building engineering and construction sequence improv...
Saved in:
Main Author: | Mathew, Joseph. |
---|---|
Other Authors: | Sim, Siang Kok |
Format: | Theses and Dissertations |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/5844 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Similar Items
-
Business process reengineering of the supply chain process for cable material in an oil rig construction facility
by: Lim, Gerard Yuen Chun
Published: (2014) -
Design Engineering or Factory Capability? Building Laptop Contract Manufacturing in Taiwan
by: Lin, Ling-Fei
Published: (2017) -
Development of an air bearing test rig
by: Yang, Rui Fang
Published: (2009) -
Improve manufacturing productivity through process re-engineering
by: Goh, Yoong Hiang.
Published: (2009) -
Cost reduction and cycle-time improvement through collaborative engineering
by: Doraisamy Raveendran
Published: (2008)