Integrated task and motion planning for quadrotors under metric interval temporal logic specifications

10.7641/CTA.2019.90602

Saved in:
Bibliographic Details
Main Authors: Lan, ML, Lai, SP, Chen, BM
Other Authors: ELECTRICAL AND COMPUTER ENGINEERING
Format: Article
Published: 2022
Online Access:https://scholarbank.nus.edu.sg/handle/10635/215304
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: National University of Singapore
Be the first to leave a comment!
You must be logged in first