Minimum-time control of crane with simultaneous traverse and hoist
American Society of Mechanical Engineers, Dynamic Systems and Control Division (Publication) DSC
Saved in:
Main Authors: | Ong, C.J., Hu, G.S., Teo, C.L. |
---|---|
Other Authors: | MECHANICAL & PRODUCTION ENGINEERING |
Format: | Article |
Published: |
2014
|
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/58487 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
Minimum-time control of a crane with simultaneous traverse and hoisting motions
by: Hu, G.S., et al.
Published: (2014) -
PERENCANAAN HOISTING PADA SEMI GANTRY CRANE KAPASITAS 60 TON
DI PT. SANGGAR SARANA BAJA
by: , TAUFAN APHA SANDITYA, et al.
Published: (2013) -
Manufacture of 3/4 ton lever hoist
by: Tan, Daniel, et al.
Published: (1979) -
Rotating traversable wormholes
by: Teo, E.
Published: (2014) -
Traverse.
by: Liang, April Ella.
Published: (2013)