R&D project scheduling when activities may fail
An R&D project typically consists of several stages. Due to technological risks, the project may have to be terminated before completion, each stage having a specific likelihood of success. In the project planning and scheduling literature, this technological uncertainty has typically been ignor...
Saved in:
Main Authors: | DE REYCK, Bert, LEUS, Roel |
---|---|
Format: | text |
Language: | English |
Published: |
Institutional Knowledge at Singapore Management University
2008
|
Subjects: | |
Online Access: | https://ink.library.smu.edu.sg/lkcsb_research/6753 https://ink.library.smu.edu.sg/context/lkcsb_research/article/7752/viewcontent/R_D_project_scheduling_when_activities_may_fail.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Singapore Management University |
Language: | English |
Similar Items
-
A hybrid scatter search/electromagnetism meta-heuristic for project scheduling
by: DEBELS, Dieter, et al.
Published: (2006) -
Phase transitions in project scheduling
by: HERROELEN, Willy, et al.
Published: (1999) -
Resource-constrained project scheduling: A survey of recent developments
by: HERROELEN, Willy, et al.
Published: (1996) -
Algorithms for scheduling projects with generalized precedence relations
by: DE REYCK, Bert, et al.
Published: (1999) -
A note on the paper “Resource-constrained project scheduling: Notation, classification, models and methods” by Brucker et al.
by: HERROELEN, Willy, et al.
Published: (2001)