INVESTMENT IN GEOTHERMAL POWER PLANT: ECONOMIC RETURN VS "REGULATED" MARKET SELLING PRICE
Although Indonesia is among only a handful of countries to develop geothermal energy, utilization of geothermal <br /> <br /> <br /> potential has proceeded very slowly and is currently facing difficult challenges and uncertainty. Over a span of 20 years, Indonesia developed...
Saved in:
Main Author: | RADITYO (NIM: 29107160) ; Pembimbing: Kin Tjendrasa, MBA, ARYO |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/15054 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
THERMODYNAMIC STUDY OF BINARY CYCLE LAHENDONG GEOTHERMAL POWER PLANT
by: GOZALY (NIM : 13106109); Pembimbing : Dr. Ir. Ari Darmawan Pasek; Prof. Dr. Ir. T. A. Fauzi S., JOAN -
THERMODYNAMICS STUDY OF FLASH-BINARY CYCLE IN THE LAHENDONG GEOTHERMAL POWER PLANT
by: GUNAWAN (NIM : 13106008); Pembimbing 1 : Dr. Ir. Ari Darmawan Pasek; Pembimbing 2 : Prof. , CHRISTIAN -
ANALYSIS AND OPTIMATION OF COOLING TOWER GEOTHERMAL POWER PLANT UNIT 4 CASE STUDY PT. PERTAMINA GEOTHERMAL ENERGY KAMOJANG AREA
by: ABIMOTO (NIM : 13107043); Pembimbing Utama : Dr. Ir. Ari Darmawan Pasek, AZFAR -
MODIFICATION OF KAMOJANG UNIT 2 GEOTHERMAL POWER PLANT USING COMBINED CYCLE
by: AZMI GHAFERY (NIM : 13106086); Pembimbing : Prof. Dr. T. A. Fauzi Soelaiman, MSME, GENISA -
DESIGN OF RADIAL INFLOW TURBINE FOR BINARY CYCLE IN LAHENDONG GEOTHERMAL POWER PLANT
by: GOZALY (NIM : 23110030); Tim Pembimbing : Prof. Dr. Ir. Aryadi Suwono; Dr. Ir. Ari D. Pasek; , JOAN