THERMODYNAMICS ANALYSIS OF DOUBLE FLASH CYCLE AT THE WAYANG WINDU UNIT 1 GEOTHERMAL POWER PLANT
This paper aims to examine technologies that can be applied at the Wayang Windu Geothermal Power Plant Unit 1 to increase capacity without drilling new wells, and only add flash separator. Hot water temperature is still between 180-190 oC at a pressure of 11.6 bar is technically still contains energ...
Saved in:
Main Author: | WIRAWAN (NIM : 131 06 042); Dosen Pembimbing : Prof. Dr. Ir. T.A. Fauzi Soelaiman, MSME , IRWAN |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/16111 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
THERMODYNAMICS STUDY OF FLASH-BINARY CYCLE IN THE LAHENDONG GEOTHERMAL POWER PLANT
by: GUNAWAN (NIM : 13106008); Pembimbing 1 : Dr. Ir. Ari Darmawan Pasek; Pembimbing 2 : Prof. , CHRISTIAN -
THERMODYNAMIC STUDY OF BINARY CYCLE LAHENDONG GEOTHERMAL POWER PLANT
by: GOZALY (NIM : 13106109); Pembimbing : Dr. Ir. Ari Darmawan Pasek; Prof. Dr. Ir. T. A. Fauzi S., JOAN -
WAYANG WINDU GEOTHERMAL RECHARGE AREA BASED ON FRACTURE ANALYSIS AND ASSOCIATED WITH WATER BALANCE AND GEOTHERMAL RESERVOIR SYSTEM
by: HENDRASTO (NIM : 32008003); pembimbing : Prof. Ir. Lambok M. Hutasoit, M.Sc., Ph.D; Prof. Dr. , FAJAR -
GAS REMOVAL SYSTEM OPTIMIZATION IN KAMOJANG UNIT 2 GEOTHERMAL POWER PLANT
by: KRISNA DANA PUTRA (NIM : 131 06 097); Pembimbing : Prof. Dr. Ir. T.A. Fauzi Soelaiman, MSME, ARIEF -
MODIFICATION OF KAMOJANG UNIT 2 GEOTHERMAL POWER PLANT USING COMBINED CYCLE
by: AZMI GHAFERY (NIM : 13106086); Pembimbing : Prof. Dr. T. A. Fauzi Soelaiman, MSME, GENISA