ANALYSIS THE EFFECT OF JOINT SPACING AND JOINT ORIENTATION OF TWIN HEADER̉̉S PRODUCTIVITY ON EXCAVATION OF TUNNEL XYZ
<p align="justify">The XYZ railway tunnel is a double track railway tunnel project that will be built along 471 m with mechanical excavation method using twin header. One of the important processes in excavation activities is the planning of excavation activities. When planning an ex...
Saved in:
Main Author: | Tridinata - Nim: 12114087 , Prastyo |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/29970 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Underground Excavation in Jointed Rocks
by: JIAO XUGUANG
Published: (2015) -
CRITICAL GRAVITATIONAL ACCELERATION ANALYSIS ON THE STABILITY OF A TUNNEL ROOF WITH A JOINT ORIENTATION OF 90o
by: Faraz Hamzah - Nim: 12114056 , Myeshia -
ANALYSIS OF THE EXCAVATION AND STABILITY METHOD AT THE JOGJA-BAWEN TWIN TOLL ROAD TUNNELS
by: Adhitya Y.L.A., Boyke -
PROBABILISTIC STABILITY ANALYSIS OF EXCAVATIONS IN JOINTED ROCK
by: LEUNG, CF, et al.
Published: (2021) -
CRITICAL GRAVITATIONAL ACCELERATION ANALYSIS ON THE STABILITY OF A TUNNEL ROOF WITH A JOINT ORIENTATION OF 45̡̉
by: FAKHTUR ARVAN (NIM : 12114086), ARI