PROGRAM CN295 PROJECT MANAGEMENT ANALYSIS AND IMPROVEMENT STRATEGY FOR PRODUCTION OF A CUSTOMIZED MEDIUM AIRCRAFT (Case Study at Indonesian Aerospace)
Where in carrying out its duties as PM for the CN295 Program, there are many obstacles if not managed properly it can lead to delayed delivery targets of aircraft to the customers. It is therefore necessary to determine a parameter that can be measured so that the work of the PM can be done categori...
Saved in:
Main Author: | Onto Witjaksono, Ibnugroho |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/42592 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
RISK ASSESSMENT IN MANUFACTURING PROCESS OF CN-235 MPA AT INDONESIAN AIRCRAFT MANUFACTURING COMPANY
by: Sukartadijaya -
PROPOSED MARKETING STRATEGY FOR CN235-220 AIRCRAFT IN LATIN AMERICA AND AFRICA REGION
by: Permanasari, Mita -
COORDINATION IN SUPPLY CHAIN IN THE USE OF RAW MATERIAL ALLUMUNIUM SHEET FOR LOGISTIC DIVISION INDONESIAN AEROSPACE
by: Irwanto, Jatu -
IMPROVING PROJECT SCHEDULE ACCURACY OF MEDIUM SCALE CONSTRUCTION PROJECT THROUGH PERT ANALYSIS.
by: Hidayatullah, Roby -
TOTAL PRODUCTIVE MAINTENANCE ANALYSIS FOR A380 PARTS. (A CASE STUDY IN INDONESIAN AEROSPACE MANUFACTURER)
by: Fadhila, Aldo