A PROPOSED KNOWLEDGE MANAGEMENT SYSTEM TO OVERCOME PROJECT DELIVERY DELAY FOR A CONSULTING FIRM, CASE OF PT BDO KONSULTAN INDONESIA
Based on the press release issued by the Investment Coordinating Board, investment realization in Indonesia has a positive trend within a period of 4 (four) years, from 2015 to 2018. In addition, with the issuance of Presidential Regulation No. 24 of 2018 related to Online Single Submission (OSS) wh...
Saved in:
Main Author: | Ayu Putri, Claudia |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/46873 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PROPOSED KNOWLEDGE MANAGEMENT SYSTEM AT PT DAYA ASESMEN INDONESIA TO OVERCOME DELAYS IN ELECTRICAL ASSESSMENT PROJECTS
by: Abdillah, Rizelfi -
A PROPOSED KNOWLEDGE MANAGEMENT SYSTEM TO OVERCOME SHIP PROJECT DELIVERY DELAY FOR A STATE-OWNED ENTERPRISE COMPANY (CASE STUDY: PT PERTAMINA TRANS KONTINENTAL)
by: Emmission Siringoringo, Mezbah -
Report on professional attachment with BDO International.
by: Ng, Chee Kiat.
Published: (2008) -
Report on professional attachment with BDO International.
by: Phua, Jacklin Su Hui.
Published: (2008) -
HUSEN SASTRANEGARA INTERNATIONAL BDO AIRPORT PLANNING
by: Raflih Khadafi, Muhammad