ANALYSIS AND EVALUATION OF WATER MANAGEMENT IN THE EAST ZONE OF THE ABC MINE SITE, PT XYZ
PT XYZ will undergo changes in its mining design according to the latest mining plan. One crucial aspect that needs attention is water management. TGL Pond responsible for handling runoff water in the East Zone of the mine. To ensure succes of water management in the East Zone, calculations of th...
Saved in:
Main Author: | Das Binsar, Lorentus |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/76819 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
EVALUATION OF DRAINAGE SYSTEM STRATEGIES FOR PIT ZONE AND BUFFER POND DUE TO PHASE CHANGES IN MINING ACTIVITIES AT ABC MINE SITE PT XYZ
by: Yasyin A R S, Mohammad -
ANALYSIS AND EVALUATION OF MINING CHANGES FROM DESIGN 1 TO DESIGN 2 ON DRAINAGE SYSTEM AND CAPACITY OF DAM S-III IN ZONE ABC OF PT XYZ MINING
by: Arbintha, Irene -
PREDICTION OF PIT LAKE WATER QUALITY IN COAL MINING (CASE STUDY IN PIT ABC PT XYZ)
by: RAIN PRATAMA (NIM : 22115021), GINDANG -
ANALYSIS OF VOLUME LOAD CHANGES IN THE BS ZONE OF BJ MINE PT XYZ
by: Magfirah, Irma -
STABILITY ANALYSIS OF ABC MINING EXTRACTION LEVEL OF PT XYZ USING CONVERGENT MEASUREMENT RESULTS
by: Rezki Al Kafi, Dimas