HYDROMINE SOLUTION: OPTIMIZATION TOOLS FOR MINE DRAINAGE AND DEWATERING IN OPEN-PIT MINING
Mine water can affect various aspects of mining operations, including the efficiency and productivity of equipment and workers, the safety and stability of slopes, and the capital costs associated with mine water pumping. Planning a mine drainage system requires complex calculations, data process...
Saved in:
Main Author: | Rahmadani, Fahrul |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/86390 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DESIGNING AN APPLICATION FOR DRAINAGE SYSTEM IN OPEN PIT MINING
by: SITA DEWI PRAHASTINI (NIM : 22110318), -
MINE DRAINAGE SYSTEM PLANNING IN ORDER TO REDIRECT NATURAL FLOW IN AN OPEN PIT MINE
by: Tanjaya, Septian -
MODEL DEVELOPMENT OF ACID MINE DRAINAGE USING CATCHMENT AREA APPROACH IN OPEN PIT COAL MINE
by: Sonny Abfertiawan, Muhammad -
DEVELOPMENT OF OPTIMIZATION MODEL OF MINE DRAINAGE DRAINHOLE DESIGN CASE STUDY GRASBERG OPEN PIT MINE PT FREEPORT INDONESIA
by: AGUNG CAHYADI, TEDY -
MINE DRAINAGE FACILITIES PLANNING IN PIT OF COAL MINING PT XYZ
by: Indriani Amir, Lili