Bunch compression of a non-relativistic 280-keV-He+ beam
At 150 kV-pulsed neutron generator at the Fast Neutron Researh Facility is being upgraded to produce a 280-kV-pulsed-He beam for Time-of-Flight Rutherford Backscattering Spectrometry (TOF RBS). Modification are being done by replacing the existing beamline elements by a 400-kV accelerating tube, 45°...
Saved in:
Main Authors: | P. Junphong, V. Ano, B. Lekprasert, D. Suwannakachorn, T. Vilaithong, H. Wiedemann |
---|---|
Format: | Book Series |
Published: |
2018
|
Subjects: | |
Online Access: | https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=24944592569&origin=inward http://cmuir.cmu.ac.th/jspui/handle/6653943832/62282 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Chiang Mai University |
Similar Items
-
The system of nanosecond 280-keV-He+ pulsed beam
by: P. Junphong, et al.
Published: (2018) -
System development of a time-of-flight spectrometer for surface analysis of materials
by: P. Junphong, et al.
Published: (2018) -
Review and analysis of autocorrelation electron bunch length measurements
by: C. Thongbai, et al.
Published: (2018) -
Coherent transition radiation from short electron bunches
by: C. S. Thongbai, et al.
Published: (2018) -
AES analysis of nitridation of Si(100) by 2-10 keV N+ 2 ion beams
by: Pan, J.S., et al.
Published: (2014)