ENERGY AUDIT OF GEOTHERMAL POWER PLANT USING INTERNATIONAL STANDARD
Informal energy audit has done in Geothermal Power Plant X on turbine device, because it is the most important component in power plant. The implementation of audit refer to technical guidance of energy audit from Ministry of Industrial Affairs. Meanwhile the method which is used refers to standard...
Saved in:
Main Author: | BUDI NUGRAHA (NIM : 22610003); Pembimbing : Dr. Ir. Abdurrachim, ADITYA |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/19807 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PERFORMANCE ANALYSIS OF "X" GEOTHERMAL POWER PLANT EJECTOR USING EMPIRICAL METHOD AND NUMERICAL METHOD
by: (NIM : 22611021); Pembimbing : Dr. Ir. Abdurrachim, AKBARI -
ENERGY OPTIMIZATION MODELING OF GEOTHERMAL POWER PLANT (CASE STUDY : DARAJAT GEOTHERMAL FIELD UNIT III, PT. CHEVRON GEOTHERMAL INDONESIA)
by: H.M.S. (NIM : 22611008); Pembimbing : Dr. Ir. Prihadi Setyo Darmanto, RIZAL -
ANALYSIS AND OPTIMATION OF COOLING TOWER GEOTHERMAL POWER PLANT UNIT 4 CASE STUDY PT. PERTAMINA GEOTHERMAL ENERGY KAMOJANG AREA
by: ABIMOTO (NIM : 13107043); Pembimbing Utama : Dr. Ir. Ari Darmawan Pasek, AZFAR -
ii DISPERSION ANALYSIS OF THE WATER VAPOR EMISSION OF GEOTHERMAL ENERGY POWER PLANTS USING CALPUFF (Case Study PT Pertamina Geothermal Energi Lapangan Kamojang Cooling tower)
by: RIFKI MUKTI (NIM :12809027);Pembimbing :Drs. Zadrach L. Dupe, M.Sc , BRAMUDYA -
THERMODYNAMIC STUDY OF BINARY CYCLE LAHENDONG GEOTHERMAL POWER PLANT
by: GOZALY (NIM : 13106109); Pembimbing : Dr. Ir. Ari Darmawan Pasek; Prof. Dr. Ir. T. A. Fauzi S., JOAN