ENERGY EFFICIENCY IMPROVEMENT IN GEOTHERMAL POWER PLANT WITH THE APPLICATION OF LOAD-BASED GAS REMOVAL SYSTEM AND COOLING WATER PUMP CONTROL SYSTEM
From a thermodynamic perspective, the operation of a Geothermal Power Plant (GPP) follows the Rankine cycle. Efficient electricity generation is achieved through the conservation of energy (enthalpy) of steam from the well to the generator, setting low condensation pressure to achieve maximum ene...
Saved in:
Main Author: | Wibisono |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/46423 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
STUDY IMPLEMENTATION OF WATER JET EJECTOR AS A GAS REMOVAL SYSTEM FOR GEOTHERMAL POWER PLANT
by: Nuryadin 23116006, Bhakti -
GAS REMOVAL SYSTEM OPTIMIZATION IN KAMOJANG UNIT 2 GEOTHERMAL POWER PLANT
by: KRISNA DANA PUTRA (NIM : 131 06 097); Pembimbing : Prof. Dr. Ir. T.A. Fauzi Soelaiman, MSME, ARIEF -
AUDIT OF EFFICIENCY ENERGY OF GEOTHERMAL POWER PLANT. (CASE STUDY: A GEOTHERMAL POWER PLANT IN DARAJAT)
by: Alfandi Ahmad, Angga -
STUDY ON THE MODIFICATION OF CONDENSER AND COOLING TOWER SYSTEM TO INCREASE TURBINE POWER OF GEOTHERMAL POWER PLANT
by: ASMORO BAHAR (NIM : 131 06 019); Pembimbing : Dr. Ir. Prihadi Setyo Darmanto, AGUNG -
DESIGN OF INSULATION SYSTEM FOR THERMAL ENERGY STORAGE AT GEOTHERMAL AND SOLAR HYBRID POWER PLANT IN ULUMBU
by: Al Syifa Elgi Wibisono, Tareqh