OPTIMIZATION OF GEOTHERMAL POWER PRODUCTION (CASE STUDY ULUMBU GEOTHERMAL POWER PRODUCTION UNIT 4 ULUMBU GEOTHERMAL WORKING AREA NTT, INDONESIA)
Ulumbu WKP is located in Manggarai Regency, East Nusa Tenggara Province, Indonesia is one of the WKP owned by PT PLN (Persero). In the Ulumbu WKP, there are four units of geothermal power plants with a capacity of 4 x 2.5 MW which have been operating since 2013. The steam used to operate all of t...
Saved in:
Main Author: | Ediatmaja, Prajamukti |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/48303 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
INCREMENTAL DEVELOPMENT STRATEGY OF GEOTHERMAL FIELD USING WELLHEAD UNIT TECHNOLOGY: CASE STUDY ULUMBU GEOTHERMAL FIELD
by: Idianto, Onny -
DESIGN OF INSULATION SYSTEM FOR THERMAL ENERGY STORAGE AT GEOTHERMAL AND SOLAR HYBRID POWER PLANT IN ULUMBU
by: Al Syifa Elgi Wibisono, Tareqh -
UPDATING CONCEPTUAL MODEL OF ULUMBU GEOTHERMAL FIELD USING NUMERICAL SIMULATION
by: Karunia Hammad, Fadhil -
FIELD DEVELOPMENT STUDY OF ULUMBU GEOTHERMAL FIELD BASED ON RESERVOIR SIMULATION
by: KURNIAWAN , IQBAL -
A NATURAL STATE MODELLING OF ULUMBU GEOTHERMAL FIELD, EAST NUSA TENGGARA, INDONESIA
by: Kurniawan, Iqbal