Planning accelerated life tests with three constant stress levels
Computers and Industrial Engineering
Saved in:
Main Authors: | Tang, L.-C., Tan, A.-P., Ong, S.-H. |
---|---|
Other Authors: | INDUSTRIAL & SYSTEMS ENGINEERING |
Format: | Conference or Workshop Item |
Published: |
2014
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/87375 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
Planning accelerated life tests with three constant stress levels
by: Tang, L.-C., et al.
Published: (2014) -
Auxiliary acceleration factor for sequential accelerated life tests: A case study
by: Liu, X., et al.
Published: (2014) -
Analysis of step-stress accelerated-life-test data: a new approach
by: Tang, L.C., et al.
Published: (2014) -
Planning for accelerated life tests
by: Tang, L.-C.
Published: (2014) -
Planning for accelerated life tests
by: Tang, L.-C.
Published: (2014)