SATISFACTION ANALYSIS OF ARGO PARAHYANGAN TRAIN PASSANGER AND ITS IMPACT ON PASSANGER LOYALTY
The construction of the Jakarta-Cikampek elevated toll road has resulted in Bandung-Jakarta travel time via tolls being faster than the travel time of Argo Parahyangan Train if the Jakarta-Cikampek flyover has been operated. This is a threat to PT KAI because the people who are currently favoring th...
Saved in:
Main Author: | Arya Prabowo, Zakaria |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/36705 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
CRASHWORTHINESS ANALYSIS OF PASSANGER RAILWAY VEHICLE STRUCTURE.
by: Pamintori, Michael -
DESIGN OF PASSANGER TERMINAL OF SULTAN THAHA AIRPORT
by: Gisela Winata, Fransisca -
DESIGN OF PASSANGER PORT STRUCTURE IN WONRELI, MALUKU
by: Septiawan Wijaya, Rizki -
PASSANGER BUILDING ADI SUMARMO AIRPORT, SURAKARTA
by: KUSUMA NAGARI (NIM : 15209047), BRAMANTI -
REVIEW OF COMPARISON BETWEEN CIRCULATION AND SPACE EFFECTIVENESS TO PASSANGER COMFORT IN THE TRAIN STATION
by: Rachmawati, Lisa