IMPLEMENTATION OF SUPERVISORY CONTROL WITH MACHINE LEARNING-BASED MULTI-OBJECTIVE OPTIMIZATION ON GEOTHERMAL POWER PLANT THROUGH DYNAMIC MODELLING CASE STUDY: DIENG GEOTHERMAL POWER PLANT UNIT 1
Saved in:
Main Author: | Alireza Nezarati, Mahdavi |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/87655 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Design of Steam Production Facility Piping System at the Geothermal Power Plant System Case Study: Dieng Geothermal Power Plant
by: Setiadi, Farid -
Exergoeconomic Study of a Combined Flash-Binary Cycle at Dieng Unit 2 Geothermal Power Plant
by: Theophilus, Jason -
Exergoeconomic Study of a Combined Flash-Binary Cycle at Dieng Unit 2 Geothermal Power Plant
by: Theophilus, Jason -
STUDY OF GEOTHERMAL STEAM PURITY IN GEOTHERMAL POWER PLANT
by: Wilantara, Bayu -
Dimension Determination and Wall StrengthAnalysis of Mini Scale Geothermal Power Plant in Dieng
by: Fauzan Priana - 13114106, Ahmad