Fast timing analysis of clock networks considering environmental uncertainty
Dynamic power management can significantly introduce environmental uncertainties such as non-uniform temperature gradients and supply voltage fluctuations. This can bring many challenges for the system-level timing verification such as for global clock networks. This paper presents a fast verificati...
Saved in:
Main Authors: | Wang, Hai, Yu, Hao, Tan, Sheldon X. D. |
---|---|
Other Authors: | School of Electrical and Electronic Engineering |
Format: | Article |
Language: | English |
Published: |
2012
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/99879 http://hdl.handle.net/10220/8563 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
SPECO : stochastic perturbation based clock tree optimization considering temperature uncertainty
by: Basir-Kazeruni, Sina, et al.
Published: (2014) -
Thermal-reliable 3D clock-tree synthesis considering nonlinear electrical-thermal-coupled TSV model
by: Shang, Yang, et al.
Published: (2013) -
A fast non-Monte-Carlo yield analysis and optimization by stochastic orthogonal polynomials
by: Tan, Sheldon X. D., et al.
Published: (2012) -
Day-ahead coordinated scheduling of hydro and wind power generation system considering uncertainties
by: Li, Yuanzheng, et al.
Published: (2020) -
Reliable 3-D clock-tree synthesis considering nonlinear capacitive TSV model with electrical–thermal–mechanical coupling
by: P. D., Sai Manoj, et al.
Published: (2013)