A SYSTEM DYNAMIC MODELLING FOR ANALYZING GROWTH OF GEOTHERMAL POWER PLANT IN INDONESIA
The Government of Indonesia has created a National Energy Policy through Presidential Regulation number 22, 2017, which set a target of New and Renewable Energy to contribute a minimum of 23% from Indonesia Energy Mix or equal to 45 GW in the year of 2025. From the target of 45 GW of new and renewab...
Saved in:
Main Author: | Wisnu Subroto, Raden |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/53242 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
MODELING AND SIMULATION ANALYSIS TOOLS FOR GEOTHERMAL POWER PLANT SYSTEM
by: Fajar Adhi Sukra, Kurnia -
Design of Steam Production Facility Piping System at the Geothermal Power Plant System Case Study: Dieng Geothermal Power Plant
by: Setiadi, Farid -
SIMULATION MODELING OF GEOTHERMAL POWER PLANT CONDENSING TURBINE TYPE CASE STUDY: WAYANG WINDU GEOTHERMAL POWER PLANT
by: AHMAD (22616002), FAISAL -
AUDIT OF EFFICIENCY ENERGY OF GEOTHERMAL POWER PLANT. (CASE STUDY: A GEOTHERMAL POWER PLANT IN DARAJAT)
by: Alfandi Ahmad, Angga -
STUDY OF GEOTHERMAL STEAM PURITY IN GEOTHERMAL POWER PLANT
by: Wilantara, Bayu